  1. A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

  2. A.

    915days

    B.

    925days

    C.

    935days

    D.

    10

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    (A + B + C)'s 1 day's work =14

     

    A's 1 day's work =116

     

    B's 1 day's work =112

     

    Therefore C's 1 day's work =14-[116+112]=[14-748]=548

     

    So, C alone can do the work in485=935days