A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:
Answer : Option C
Explanation :
(A + B + C)'s 1 day's work =14
A's 1 day's work =116
B's 1 day's work =112
C's 1 day's work =14-[116+112]=[14-748]=548
So, C alone can do the work in485=935days