  1. If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:

  2. A.

    4 days

    B.

    5 days

    C.

    6 days

    D.

    7 days

    View Answer

    Workspace

    Answer : Option A

    Explanation :

    Let 1 man's 1 day's work = x and 1 boy's 1 day's work = y.

     

    Then, 6x + 8y =110and 26x + 48y =12

     

    Solving these two equations, we get : x =1100and y =1200

     

    (15 men + 20 boy)'s 1 day's work =[15100+20200]=14

     

     15 men and 20 boys can do the work in 4 days.