Discussion :: Time and Work
-
A does 80% of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?
Answer : Option C
Explanation :
Whole work is done by A in[[20∗54]= 25 days.
Now,[1-45]i.e.,15work is done by A and B in 3 days
Whole work will be done by A and B in (3 x 5) = 15 days.
A's 1 day's work =125,, (A + B)'s 1 day's work =115
B's 1 day's work =[115-125]=4150=275
So, B alone would do the work in752=3712days