- If 5 men can colour 50-meter long cloth in 5 days, in many days 4 men can color a 40-meter long cloth?
Answer : Option A
Explanation :
5 men colour 50-meter long cloth in 5 days.
1 man will colour= 10-meter long cloth in five days.
So, in one day one man can colour= 2-meter long cloth.
Now, as per question 4 men are supposed to colour the 40-meter long cloth.
One man has to colour the = 10 meter cloth
For 2-meter long cloth one man takes 1 day
So, to paint 10-meter long cloth he will take =
As, 4 men are working together so 40 m long cloth will be coloured in 5 days
Quicker method:
Apply formula: M1D1W2 = M2D2W1
5*5*40 = 4*D2*50
D2=