  1. The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.

  2. A.
    1-5
    B.
    20-40
    C.
    100-150
    D.
    1000-1500

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    No answer description available for this question.