Home / Civil Engineering / Advanced Surveying :: Discussion

Discussion :: Advanced Surveying

  1. The negative sign is assigned to

  2. A.
    reduction to mean sea level
    B.
    correction for horizontal alignment
    C.
    correction for slope
    D.
    correction for slope
    E.
    all the above.

    View Answer

    Workspace

    Answer : Option E

    Explanation :

    No answer description available for this question. Let us discuss.


Be The First To Comment