  1. Depth of lean concrete bed placed at the bottom of a wall footing, is kept

  2. A.

     10 cm

    B.

     15 cm

    C.

     Equal to its projection beyond wall base

    D.

     Less than its projection beyond wall base

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    Explanation Not Provided