Discussion :: Building Construction
- Pick up the correct statement from the following:
A.
Inclined borings are made for taking samples under existing structures |
B.
Inclined borings are occasionally used instead of vertical holes |
C.
The spacing of inclined borings is kept such that one bore hole is vertically above the bottom of an adjacent bore hole |
D.
All the above |
Answer : Option D
Explanation :
Explanation Not Provided