Home / Civil Engineering / Building Construction :: Discussion

Discussion :: Building Construction

  1.  

    Pick up the incorrect statement from the following :

  2. A.

    the width of the wall is constructed thicker at the base in a stepped fashion

    B.

    a long vertical load transferring concrete structure is called a concrete pile

    C.

    in pile which transfers the load to the soil by the friction between the pile and the surrounding soil is called friction pile.

    D.

    the pile which transfers the load to a hard rock bed at certain depth is called load bearing

    E.

    none of the these.

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.


Be The First To Comment