  1. Hardening of cement occurs at

  2. A.

    rapid rate during the first few days and afterwards it continues to increase at a decreased rate

    B.

    slow rate during the first few days and afterwards it continues to increase at a rapid rate

    C.

    uniform rate throughout its age

    D.

    none of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  3.  

    Pick up the correct statement from the following:

  4. A.

    Lime in excess, causes the cement to expand and disintegrate

    B.

    Silica in excess, causes the cement to set slowly

    C.

    Alumina in excess, reduces the strength of the cement

    D.

    Magnesium oxide in excess, remains in free state and makes the cement unsound

    E.

    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  5. Batching error means inaccuracy in the quantity of

  6. A.
    aggregates
    B.

    cement

    C.

    water

    D.
    all the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  7.  

    Pick up the correct statement from the following i.

  8. A.
    Higher workability indicates unexpected increase in the moisture content
    B.

    Higher workability indicates deficiency of sand

    C.

    If the concrete mix is dry, the slump is zero

    D.

    Concrete mix having zero slump, is unsuitable for high strength.

    E.
    All the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  9.  

    You are asked to construct a massive dam, the type of cement you will use, is

  10. A.

    ordinary Portland cement

    B.

    rapid hardening cement

    C.

    low heat cement

    D.

    blast furnace slag cement

    E.

    white cement.

    View Answer

    Workspace

    Discuss Discuss in Forum


  11. The produce impermeable concrete

  12. A.

    thorough mixing of concrete is required

    B.

    proper compaction of concrete is required

    C.

    proper curing of concrete is required

    D.

    properly graded and non-porous aggregates are requied

    E.

    all the above.

    View Answer

    Workspace

    Discuss Discuss in Forum


  13. Water required per bag of cement, is

  14. A.

    7 kg

    B.

    14 kg

    C.

    21 kg

    D.

    28 kg

    E.

    35 kg

    View Answer

    Workspace

    Discuss Discuss in Forum


  15. Pick up the incorrect statement from the following:

  16. A.

    The bottom and top ends of slump mould are parallel to each other

    B.

    The axis of the mould is perpendicular to the end faces

    C.

    The internal surface of the mould is kept clean and free from set cement

    D.

    The mould is in the form of a frustum of hexagonal pyramid

    E.

    None of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  17. ISI has specified full strength of concrete after

  18. A.

    7 days

    B.

    14 days

    C.

    21 days

    D.
    28 days
    E.

    none of these.

    View Answer

    Workspace

    Discuss Discuss in Forum


  19. For construction of structures in sea water, the cement generally preferred to, is

  20. A.

    Portland-pozzolana cement

    B.
    quick setting cement
    C.
    low heat Portland cement
    D.
    rapid hardening cement
    E.

    none of these.

    View Answer

    Workspace

    Discuss Discuss in Forum