  1. The difference between the time avail-to do a job and the time required to do the job, is known as

  2. A.

     Event

    B.

     Float

    C.

     Duration

    D.

     Constraint

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    Explanation Not Provided