Home / Civil Engineering / Engineering Economics :: Discussion

Discussion :: Engineering Economics

  1. Pick up the correct statement from the following:

  2. A.

     Over head rate = total over head in rupees for period/Direct labour in rupees for period

    B.

     Over head cost per unit = Overhead ratio × direct labour cost/unit

    C.

     Both (A) and (B)

    D.

     Neither (A) nor (B)

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    Explanation Not Provided