Home / Civil Engineering / Engineering Economy :: Discussion

Discussion :: Engineering Economy

  1. Which method is adopted to develop an approximate or conceptual estimate for perimeter works for buildings from the following:

  2. A.
    Base unit method
    B.
    Cost per function method
    C.
    Cost per square metre method
    D.
    Cost per cubic metre method
    E.
    Cost per linear metre method

    View Answer

    Workspace

    Answer : Option E

    Explanation :

    No answer description available for this question.


Be The First To Comment