Home / Civil Engineering / Engineering Economy :: Discussion

Discussion :: Engineering Economy

  1. Pick up the correct method adopted for developing the approximate or conceptual estimates from the following :

  2. A.
    Base unit method
    B.
    Cost per function method
    C.
    Cost per square metre
    D.
    Cost per linear unit
    E.
    All of these

    View Answer

    Workspace

    Answer : Option E

    Explanation :

    No answer description available for this question.


Be The First To Comment