  1. The construction manager uses the estimate of the project

  2. A.
    to tell the owner of the project to take his/her financial decision.
    B.
    to advise the architect/engineer regarding design cost parameter especially in value engineering analysis.
    C.
    to develop bids on the project.
    D.
    to control the project during its construction.
    E.
    All of these

    View Answer

    Workspace

    Answer : Option E