Home / Civil Engineering / Highway Engineering :: Discussion

Discussion :: Highway Engineering

  1. The total value of extra widening required at a horizontal curve on a two lane hill road of radius 42 m for a design speed of 50 kmph and for vehicles with wheel base 6 m, is

  2. A.
    0.500 m
    B.
    0.589 m
    C.
    1.089 m
    D.
    0.089 m

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question. Let us discuss.


Be The First To Comment