Home / Civil Engineering / Highway Engineering :: Discussion

Discussion :: Highway Engineering

  1. Depth of reinforcement below the surface of a concrete pavement, is generally kept

  2. A.
    5 cm
    B.
    6 cm
    C.
    7 cm
    D.
    8 cm
    E.
    9 cm

    View Answer

    Workspace

    Answer : Option A

    Explanation :

    No answer description available for this question. Let us discuss.


Be The First To Comment