Discussion :: Highway Engineering
- Select the correct statement.
A.
Quantity of binder required for tack coat is less than that required for prime coat. |
B.
Prime coat treatment is given for plugging the voids in water bound macadam during bituminous road construction. |
C.
Seal coat is the final coat over certain previous bituminous pavements. |
D.
A bitumen primer is a high viscosity cutback. |
Answer : Option D
Explanation :
Explanation Not Provided