- Select the incorrect statement.
A.
Stop or red time of a signal is the sum of go and clearance intervals for the cross flow. |
B.
Go or green time of a signal is the sum of stop and clearance intervals for the cross flow. |
C.
Clearance time is generally 3 to 5 seconds. |
D.
The cycle length is normally 40 to 60 seconds for two phase signals. |
Answer : Option B
Explanation :
Explanation Not Provided