  1. If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be

  2. A.

     1 + (0.9)010

    B.

     1 – (0.9)°l0

    C.

     1/(1-0.9°10)

    D.

     1/(1+ 0.9010)

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    Explanation Not Provided