Home / Civil Engineering / Irrigation Engineering :: Discussion

Discussion :: Irrigation Engineering

  1. Borrow pits should preferably be located in

  2. A.

     Field on the left side of the canal

    B.

     Field on the right side of the canal

    C.

     Fields on both sides of the canal

    D.

     Central half width of the section of the canal

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided


Be The First To Comment