  1. If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be

  2. A.

     aqueduct

    B.

     superpassage

    C.

     syphon

    D.

     syphon aqueduct

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    Explanation Not Provided