Home / Civil Engineering / Irrigation Engineering :: Discussion

Discussion :: Irrigation Engineering

  1. Pick up the correct statement from the following

  2. A.

     In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal

    B.

     In a level crossing a regulator is provided across the drainage at its down-stream

    C.

     In a level crossing, a cross regulator is provided on the canal below the crossing

    D.

     All the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided


Be The First To Comment