  1. The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be

  2. A.

     20 m3/sec

    B.

     25 m3/sec

    C.

     30 m3/sec

    D.

     35 m3/sec

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    Explanation Not Provided