Pick up the correct statement from the following
A.
In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal |
|
B.
In a level crossing a regulator is provided across the drainage at its down-stream |
|
C.
in a level crossing, a cross regulator is provided on the canal below the crossing |
|
D.
|
Answer : Option D
Explanation :
No answer description available for this question.