Discussion :: Railway Engineering
-
Consider the following surveys.
1. Reconnaissance survey
2. Preliminary survey
3. Traffic survey
4. Location survey
The correct sequence in which these surveys are conducted before the alignment of a track is finalised is
Answer : Option D
Explanation :
Explanation Not Provided
Be The First To Comment