Home / Civil Engineering / Railways :: Discussion

Discussion :: Railways

  1. To design a cross-over between parallel tracks, the required components are :

  2. A.

    two switch, points, two acute angle crossings and two check rails

    B.

    two switch points, two acute angle crossings and four check rails

    C.

    two switch points, two acute angle crossings and six check rails

    D.

    none of these.

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    No answer description available for this question.


Be The First To Comment