  1. On a straight railway track, absolute levels at point A on two rails are 100.550 m and 100.530 m and the absolute levels at point B 100 m apart are 100.585 m and 100.515 m respectively, the value of twist of rails per metre run, is

  2. A.

    0.4 mm

    B.

    0.5 mm

    C.

    0.7 mm

    D.

    0.8 mm

    E.

    1.0 mm

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    No answer description available for this question.


Be The First To Comment