  1. The quantity of stone ballast required per metre tangent length, is

  2. A.

    1.15 m3

    B.

    1.14 m3

    C.

    1.13 m3

    D.

    1.12 m3

    E.

    1.11 m3

    View Answer

    Workspace

    Answer : Option E

    Explanation :

    No answer description available for this question.