Home / Civil Engineering / Railways :: Discussion

Discussion :: Railways

  1. A wing rail is renewed or reconditioned if its maximum vertical wear is

  2. A.

    9.5 m

    B.

    7.5 m

    C.

    5.5 m

    D.

    5.0 m

    Answer : Option A

    Explanation :

    No answer description available for this question.


Be The First To Comment