Home / Civil Engineering / Steel Structure Design :: Discussion

Discussion :: Steel Structure Design

  1. If d is the clear depth of a plate girder, t is the minimum required thickness of the web, C is the maximum clear distance between vertical stiffeners, the moment of inertia of a pair of stiffeners about the centre line of the web, is

  2. View Answer

    Workspace

    Answer : Option A

    Explanation :

    No answer description available for this question. Let us discuss.


Be The First To Comment