Civil Engineering :: Surveying
-
While measuring the distance between two points along upgrade with the help of a 20 m chain, the forward end of the chain is shifted forward through a distance
-
Subtense tacheometry is generally preferred to if ground is
-
For high sensivity of the bubble tube
-
Short offsets are measured with
-
The operation of revolving a plane table about its vertical axis so that all lines on the sheet become parallel to corresponding lines on the ground, is known
-
There are two stations A and B. Which of the following statements is correct :
-
Chain surveying is well adopted for
-
In a closed traverse, sum of south latitudes exceeds the sum of north latitudes and the sum of east departures exceeds the sum of west departures, then, the closing line will lie in
-
A sewer is laid from a manhole A to a manhole B, 250 m away along a gradient of 1 in 125. If the reduced level of the invert at A is 205.75 m and the height of the boning rod is 3 m, the reduced level of the sight rail at B, is
-
The Huygen's telescope eye piece