Home / Civil Engineering / Tunneling :: Discussion

Discussion :: Tunneling

  1. For transferring the tunnel alignment through shafts, we adopt the following steps :
    1. Hanging two or more plumb lines in the shaft
    2. Determining the bearing of the plumb lines i.e. plumb plane
    3. Suspending a 35 kg weight by each plumb line
    4. Immersing the weights of both the plumb lines in the buckets containing water.
    The correct sequence of steps is :

  2. A.
    1 2 3 4
    B.
    4 3 2 1
    C.
    l 3 2 4
    D.
    2 1 4 3

    View Answer

    Workspace

    Answer : Option A

    Explanation :

    No answer description available for this question.