Discussion :: UPSC Civil Service Exam Questions
-
In a trigonometric levelling, the height of the signal used is 4.62 m and the instrument height is 1.25 m. If the horizontal distance of the target from the instrument is 5780 m, then the axis-signal correction is
Be The First To Comment