  1. If the difference of height between two points is 1 m and the slope distance between them is 100 m, then accuracy of slope correction determination could be 1 in 1, 00, 000, provided the heights are measured with an accuracy of

  2. A.
    ± 0.1 cm
    B.
    ± 0.5 cm
    C.
    ± 1.0 cm
    D.
    ± 5.0 cm

    View Answer

    Workspace

    Answer : Option A

    Explanation :

    No answer description available for this question. Let us discuss.


Be The First To Comment