Civil Engineering :: Waste Water Engineering
- Dry water flow in a combined sewer, is
- A sewer running partially full and hurried with back filled, fails in compression due to
- The ratio of design discharge to the surface area of a sedimentation tank is called
- Chlorination of water is done for the removal of
- Depletion of ozone layer in the outer atmosphere may cause
- For treating the sewage of a large city, you will recommend
- In sewers the effect of scouring is more on
- For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by
- The density of population over 40 hectares is 250/hectare. If water supply demand per day is 200 litres and sewage discharge is 80% of water supply, the sewage flow in sewers of separate system, is