Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by

  2. A.

    Kinchling

    B.

    Lloyd Davis

    C.

    Frubling

    D.

    all the above.

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.


Be The First To Comment