Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. The detention time (t) of a settling tank, may be defined as the time required for

  2. A.
    a particle to travel along its length
    B.
    a particle to travel from top surface to bottom sludge zone
    C.

    the flow of sewage to fill the tank

    D.

    none of these.

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question.


Be The First To Comment