Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. In case of sewer lines

  2. A.

    water test is carried out to check water tightness of the joints

    B.

    test for straightness is carried out with the help of a lamp and mirror

    C.
    obstruction test is carried out with the. help of smooth ball of diameter 13 mm
    D.

    all the above.

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.