Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. Sewer pipes need be checked for

  2. A.
    minimum flow
    B.

    maximum flow

    C.

    both (a) and (b)

    D.

    none of these.

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question.


Be The First To Comment