Discussion :: Waste Water Engineering
-
The sewers
A.
|
|
B.
must flow under gravity \( \frac { 1 } { 2 } \) to \( \frac { 3 } { 4} \) full |
|
C.
must be laid at least 2 to 3 m deep to collect /water from the basements |
|
D.
all the above. |
Answer : Option D
Explanation :
No answer description available for this question.
Be The First To Comment