Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. Pick up the correct statement from the following :

  2. A.

    Hydrogen sulphide gas in excess, may cause corrosion of concrete sewers

    B.

    4 ppm of Dissolved Oxygen (D.O.) is ensured before discharging the treated sewage in river

    C.

    Solubility of oxygen in sewage is 95% of that of distilled water

    D.

    Dissolved oxygen content of sewage, may be determined by Winkler's method

    E.

    All the above.

    View Answer

    Workspace

    Answer : Option E

    Explanation :

    No answer description available for this question.


Be The First To Comment