Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of

  2. A.

     100 cm

    B.

     120 cm

    C.

     140 cm

    D.

     160 cm

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided