Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. Rate of flow of sewage is generally assumed

  2. A.

     More than the rate of water supply

    B.

     Equal to the rate of water supply

    C.

     Less than the rate of water supply

    D.

     At 150 litres per capita

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided


Be The First To Comment