  1. In septic tanks,

  2. A.

     Free board of 0.3 m may be provided

    B.

     The baffles or tees are extended up to top level of scum

    C.

     The clear space between the baffle top and covering slab is about 7.5 cm

    D.

     All the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided