Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. Sewer ventilating columns are generally placed at

  2. A.

     Distances 150 m to 300 m

    B.

     Upper ends of branch sewers

    C.

     Every change in the size of sewers

    D.

     All the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided


Be The First To Comment