Discussion :: Waste Water Engineering
- Pick up the correct statement from the following:
A.
Hydrogen sulphide gas in excess, may cause corrosion of concrete sewers |
B.
4 ppm of Dissolved Oxygen (D.O.) is ensured before discharging the treated sewage in river |
C.
Solubility of oxygen in sewage is 95% of that of distilled water |
D.
All the above |
Answer : Option D
Explanation :
Explanation Not Provided
Be The First To Comment