Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is

  2. A.

     100 cm

    B.

     90 cm

    C.

     80 cm

    D.

     50 cm

    View Answer

    Workspace

    Answer : Option A

    Explanation :

    Explanation Not Provided


Be The First To Comment