Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. In case of sewer lines

  2. A.

     Water test is carried out to check water tightness of the joints

    B.

     Test for straightness is carried out with the help of a lamp and mirror

    C.

     Obstruction test is carried out with the help of smooth ball of diameter 13 mm

    D.

     All the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided


Be The First To Comment