- Pick up the correct statement from the following:
A.
The maximum rate of storm runoff is called peak drainage discharge |
B.
Rational method of estimating peak run off, may be used precisely for areas less than 50 hectares |
C.
The period after which the entire area starts contributing to the runoff, is called the time of concentration |
D.
All the above |
Answer : Option D
Explanation :
Explanation Not Provided